Meeting Minutes July 10, 2012

July 10, 2012

Regular Board meeting called to order at 7:00 p.m.. Present: Bruce Hokanson, Kerry Tetzner, John Hartzell, Steven Tetzner, Donna Chapman.

Meeting notices were properly posted in the three public places and published in the Daily Press.

Meeting minutes from the June 12, 2012 meeting were read and written copies given to the Board members. A motion by Steven Tetzner and a second by John  Hartzell to accept as presented. Motion carried. All ayes.

Donna gave Treasurer’s report.  A motion by JohnHartzell and a second by Steven Tetzner to accept report. Motion carried. All ayes.

Bruce Hokanson gave a report for the road crew. They are mowing the ditches and grading. They also did the slurry seal under the bridge on Church Corner Road. A motion by John Hartzell amd a second by Steven Tetzner to accept report. Motion carried. All ayes.

There was no Plan Commission meeting this month.

Bids for a 84” Diameter round 5” x 1” corrugations, Aluminized Ga. and two foot  wide connecting band  for culvert on Brevak Road were opened with a bid from PK Forest Farms at $8955.00 and from County materials Corp. for $12,834.00. A motion by Steven Tetzner and a second by John Hartzell to accept the bid from PK Forest Farms. Motion carried. All ayes.

The bids for construction on Brevak Road culvert were opened by Ben Dufford. A bid from Ashland Construction was $18,888.00 and one from K & D was $13850.00. K & D got the bid.

A motion and a second to pay all current bills.

A motion and a second to adjourn.

 

 

Kerry Tetzner, Clerk